
$134,631. Complete Siemens PLC-based flood alarm system for the USCGC Polar Star (WAGB-10), the nation's only operational heavy icebreaker, delivered under the vessel's Service Life Extension Program.

$555,639. Design and fabrication of replacement switchboards for the NOAA Ship Fairweather (S220), a 231-foot hydrographic survey vessel, under a direct federal contract.

$263,710. Integrated dial telephone, public address, and general alarm system for the NOAA Ship Oscar Elton Sette, under contract with NOAA OMAO.

$14,999. A complete 70-volt marine public address equipment package for the NOAA Ship Rainier, a hydrographic survey vessel, specified against the vessel's general plans and drop-shipped direct to the government receiving point under a firm lump sum.

Thousands of hours across the WSF fleet including the Puyallup. WiFi installation, visual paging systems, and routine arrestor cleaning.

PA/GA system installation on an operational vessel for TOTE Maritime's Alaska service.

$397K fire alarm and detection system installation. Part of the Coast Guard's Service Life Extension Program for the WMEC 270 class.